TBDBuilding permits
Policy
How Builders Can Accelerate The Pre-Construction Permit Process
By surfacing municipal requirements and digitizing the permit process, Ivory Prize-winner PermitFlow saves applicants’ time, minimizes errors, and shortens municipal review cycles — resulting in a faster time to permit. That can lead to more attainable homes.
Leadership
Lose the Battle, Lose the War: Solutions to the Labor Crisis
In Part 2 of Capability and Culture, our Dream Team measures the ramifications of construction's labor crisis, and how the consequences of this seemingly insurmountable challenge may be the catalyst needed to embrace innovation.
![How Builders Can Accelerate The Pre-Construction Permit Process](https://www.thebuildersdaily.com/content/images/2023/08/PermitFlow_story_082823.jpg)
![Lose the Battle, Lose the War: Solutions to the Labor Crisis](https://www.thebuildersdaily.com/content/images/2021/05/AdobeStock_211787350-1.jpeg)
Building permits
Policy 08.28.23
How Builders Can Accelerate The Pre-Construction Permit Process
By surfacing municipal requirements and digitizing the permit process, Ivory Prize-winner PermitFlow saves applicants’ time, minimizes errors, and shortens municipal review cycles — resulting in a faster time to permit. That can lead to more attainable homes.
Leadership 05.18.21
Lose the Battle, Lose the War: Solutions to the Labor Crisis
In Part 2 of Capability and Culture, our Dream Team measures the ramifications of construction's labor crisis, and how the consequences of this seemingly insurmountable challenge may be the catalyst needed to embrace innovation.